Service Hotline 18617145297

Mauritius VOC certification control scope:
electronic and electrical products
-: Process
Application-testing-inspection-certification.
2: Information required for application:
1 application form
2 Invoice 3 Box List 4 Test Report
3: Testing requires data
1 If the product has a test report and is within the validity period, it is not needed. If not, please provide product pictures and instructions to verify the test cost! IV. Inspection
1 Main inspection of origin mark (MADE IN CHINA)2 Electrical parameters are that apricots meet Mauritius national requirements
3 Whether the quantity, product name, model, etc. of on-site products are consistent with the application form, invoice, and the information on the test report. Five certificates are issued.
1 A draft certificate will be issued after passing the inspection
2. An official certificate can be placed after confirmation (the certificate is valid for one time and must be applied for for each batch of goods)
6: Cost and cycle:
1. Cost: Provide proforma invoice and packing list, picture customs code and total value to verify
2. The cycle is expected to be 12-15 days (including 5-7 days for the test report, 2-3 days for submitting the (report + application form) to the agency for review, 2-3 days for arranging personnel to inspect the goods, and 2 days for issuing the certificate)